The short answer
Track retainer hours by logging every piece of client work against the client's retainer project, as it happens, and by having one named person compare the hours used with the hours available every week. The hours themselves are easy. In our view, the trouble starts when the rules stay in someone's head: what counts, what carried over from last month, and who looks.
This guide covers what to record, who checks it and when, and one month worked through from start to finish. It assumes an hours-based retainer, where the client buys a set number of hours a month. For other kinds of retainer, and for how to price one, see retainers vs projects.
What to record on every entry
An entry that cannot be tied to a retainer cannot be counted against it. Six fields are enough:
- Client and retainer. Better still, a project that exists only for that retainer, so nobody has to remember which client a task belongs to.
- Date. The retainer month is decided by the date the work was done, not the date it was entered.
- Hours. In one unit, in decimals (1.5, not 1:30), so weekly totals add up without conversion.
- Person. You will want to know who did the work when the client asks why a month was heavy.
- Task or ticket. The one thing the entry was for, so the monthly report can name where the hours went.
- A short note when the work is outside the usual scope, so there is a record when you ask the client to approve it.
Decide what counts, and write it down once
The hours are easier to settle than the question of what counts. Settle these before the first month and put the answers in the agreement:
- Meetings and account management. Do calls with the client draw down the hours? If not, who pays for them?
- Rework. In our view, fixing your own mistake should not draw down the client's hours. Say so.
- Billable and non-billable. Decide whether the retainer counts only work you would bill, or everything logged against the client's retainer project. Our billable time decision table lists 27 activities with a default for each.
- Leave and holidays. Paid leave is never client work, so keep it out of the retainer hours.
- Unapproved time. If your team approves timesheets, decide whether pending hours count yet. A retainer figure that changes when someone approves last week is a figure nobody trusts.
Who checks it, and when
A retainer needs one person who owns the numbers, for example the account lead, and a rhythm short enough to catch a problem while it can still be fixed.
| When | Who | What they check |
|---|---|---|
| Every day, as work is done | Whoever did the work | The entry is on the right retainer project, with a task and a note if it is out of scope. |
| Every Monday | Account lead | Hours used so far against hours available, and against how much of the month has passed. |
| When the used share passes about three quarters | Account lead | What is still planned for the month, and whether the client needs a heads-up now. |
| Last working day | Account lead | The month's total, what carries over, and any overage to raise. |
| First working day of the next month | Account lead | The monthly report goes to the client. |
| Each quarter | Account lead and a director | Whether the allowance still fits: a client who uses 60% of it every month, or runs over every month, is telling you something. |
The percentages above are a method, not an industry statistic. Tune them to your clients.
A worked month
An example retainer: the client buys 30 hours a month. Unused hours roll over to the next month, up to a cap of 10 hours. Last month, 4 hours were unused, so March starts with 4 carried in. All the numbers below are illustrative.
| Week | Dates | Hours logged | Used so far | Left of 34 |
|---|---|---|---|---|
| 1 | 1 to 7 March | 8 | 8 | 26 |
| 2 | 8 to 14 March | 9 | 17 | 17 |
| 3 | 15 to 21 March | 7 | 24 | 10 |
| 4 | 22 to 28 March | 6 | 30 | 4 |
| 5 | 29 to 31 March | 0 | 30 | 4 |
- Available hours. 30 allowed plus 4 carried in is 34 hours for March.
- Monday of week 3 (15 March). 17 hours used of 34, which is 50%, with 14 of 31 days gone (45%). On pace. The account lead notes that a campaign launch is planned for week 4.
- Monday of week 4 (22 March). 24 hours used, 10 left, with 9 days to go. The launch needs about 6 hours. Nothing to escalate.
- 31 March. 30 hours used, 4 left. The rule carries up to 10 hours, so all 4 carry into April, which starts with 34 available.
- 1 April. The report goes out: 34 available, 30 used, 4 carried, the top three tasks by hours, and what is planned for April.
You can type this same month into the retainer hours tracker and check its totals against the table. For a mid-month check on any retainer, the free retainer hours calculator shows the hours left and where the month will end if the pace so far continues.
Common mistakes
- Logging against the client, not the retainer. A client with a retainer and a separate project needs two places to log, or the retainer figure includes project work.
- Counting from the invoice date. The retainer month follows the work, so a late entry belongs to the month the work happened.
- Checking at month end only. By then an overrun is spent. A weekly check is what gives you time to talk to the client.
- No owner. If everyone could check, nobody does.
- Leaving out the carry. A retainer figure that ignores what rolled in will look like an overrun in one month and a surplus in the next.