Utilisation rate

Utilisation rate is the share of a person's or team's available working hours that are spent on billable work, shown as a percentage.

Why it matters for agencies

Utilisation is the clearest single measure of whether an agency is using its people to earn. Too low and the agency carries unpaid capacity; too high and people burn out, quality slips and there is no room for sales or training.

How to do it or work it out

Divide billable hours by available hours. Be clear about what "available" means: the common choices are contracted hours, or contracted hours minus leave and public holidays. The second is fairer because nobody can bill on a day they are on leave.

Set the target from your own costs, not from a published benchmark. Roles differ: a director who sells and manages will have a much lower target than a designer on client work.

State the basis every time you quote a figure. Billable over contracted hours, billable over available hours, and billable plus productive internal work over available hours give three different answers for the same week. Comparing one team's first measure with another's second is the most common way utilisation misleads.

A worked example

A developer is contracted for 160 hours in a month. They take 8 hours of leave and there is one 8-hour public holiday, so available hours are 160 minus 16, which is 144. They log 101 billable hours. Utilisation is 101 divided by 144, about 70 percent. Measured against contracted hours it would be 63 percent, which is why you state the basis. The next month the same developer has no leave and no holiday, so available hours are 160, and they log 112 billable hours. Utilisation is 112 divided by 160, which is 70 percent again, even though billable hours rose from 101 to 112. The available-hours basis keeps the two months comparable.

Common mistakes

  • One target for everyone. A director, a project manager and a developer spend their time differently, so give each role its own target and review it twice a year.
  • Copying a published benchmark. Benchmarks depend on how each source defines available hours and which roles it counts. Set the target from your own costs instead.
  • Ignoring leave and holidays. A month with a public holiday and a week of leave has fewer available hours, and measuring against contracted hours makes a normal month look like a slump.